空间整体规划与室内设计

工装室内设

流程分为三个阶段:一、策划阶段 二、方案阶段   三、施工图阶段

一、策划阶段包括(任务书、收集资料、设计概念草图)

1、任务书:由甲方或业主提出

1)使用功能 (2)确定面积 (3)经营理念(4)风格样式 (5)投资情况

2、收集资料

1)原始土建图纸 (2)现场勘测

3、设计概念草图,由设计师与业主共同完成

1)反映功能方面的草图 (2)反映空间方面的草图 (3)反映形式方面的草图

4)反映技术方面的草图

二、方案阶段包括(概念草图深入设计、与土建和装修前后的衔接、协调相关的工种、方案成果)

1、在概念草图的基础上,深入设计,进行方案的分析与比较

1)功能分析 (2)交通流线分析 (3)空间分析(4)装修材料的比较与选择

2、与土建和装修的前后衔接

1)不足与制约 (2)承重结构 (3)设施管道

3、相关工种协调(设备优先原则)

1)各种设备之间的协调 (2)设备与装修的协调

4、方案成果(作为施工图设计、施工方式、概念的依据)

1)图册 (2)模型 (3)动画

设计说明、平面图、立面图、剖面图、透视图(效果图)、模型、材料样板等

三、施工图阶段(造型、材料、做法)包括(装修施工图、设备施工图)

1、装修施工图

1)设计说明、工程材料做法表、饰面材料分类表、装修门窗表

2)隔墙定位平面图、平面布置图、铺地布置图、天花布置图、放大平面图

3)立面图、剖面图

4)大样图、详图

2、设备施工图

1)给排水:系统、给排水不知、消防喷淋

2)电气:强电系统、灯具走线、开关插座、弱电系统、消防照明、消防监控

3)暖通:系统、空调布置。

 

Tooling interior design process is divided into three phases: a planning stage two, the third phase of the program, the construction drawing stage
Planning stage (the mission statement, the collection of information, design concept sketches)
1, the mission statement: by the Party or the owners
(1) functions (2) determine the area of (3) business philosophy (4) styles (5) Investment in
2, to collect information
(1) the original civil drawings (2) site survey
3, the design concept sketches by the designers and owners to complete
(1) reflect the functional aspects of the sketch (2) reflect the spatial aspects of sketch (3) reflect the form of sketches
(4) reflect the technical aspects of the sketch
Second, the phase of the program (concept sketch in-depth design and coordination of related types of work with the interface before and after the civil construction and decoration, the results of the program)
1, on the basis of the concept sketch, in-depth design of program analysis and comparison
(1) Functional Analysis (2) traffic flow lines of (3) spatial analysis (4) decoration materials and selection
2, with civil construction and renovation before and after the convergence
(1) shortage and constraints (2) load-bearing structure (3) facilities in the pipeline
3 types of work coordination (the principle of giving priority to equipment)
(1) co-ordination between various devices (2) the coordination of the equipment and decoration
4, the results of the program (as a construction drawing design, construction methods, the basis of the concept)
(1) Atlas (2) model (3) animation
Design specifications, plans, elevations, sections, perspective drawings (renderings), model, material model, etc.
Third, the construction drawing stage (shape, material, practice) (Figure renovation construction, equipment, construction drawings)
1, renovation construction plans
(1) design practice table of engineering materials, decorative materials, classification table, fitting doors and windows of the table
(2) wall positioning plan, floor plan, floor layout, ceiling layout to enlarge floor plan
(3) elevations, sections
(4) samples, details
2, equipment, construction plans
(1) water supply and drainage: the system, water supply and drainage do not know, the fire sprinkler
(2) Electrical: strong power system, lamp alignment, switch socket, weak systems, fire lighting, fire protection monitoring
(3) HVAC: The system, air-conditioning layout.